Thursday, June 28, 2007

Proof of Progress

As promised here are pics of our progress thus far. We've focused on the 2nd floor guest area/fritz's studio. This space was divided to inlcude two guest bedrooms, a hallway (we dropped the ceilings to 8 ft and created a loft area), a laundry closet, utility closet, full guest bath, studio kitchenette, studio full bath and fritz's studio. They also demoed the master bedroom to get rid of a wall and open space for the master bath/dressing room. They've turned the master into their tool/workspace. They also started framing/drywall in the downstairs studio bath so we can start using that while they finish the upstairs baths. So without further a do this what Roger and Fritz have accomplished since Roger arrived June 1 (I take no credit in the manual labor, my job was to take pictures and to put together everything for the loan)

I'm going to have to guestimate the start date of these images. Roger arrived on June 1 and I broke the camera about shortly after so I'm going to say June 5th is the start of this work.
hallway to fritz's kitchenette, bath and studio, before any demo
demoed guest bedroom/hall area

demo in master bath area
master suite area

opened master suite
demo in guest bedrooms





the cool dumpster shoot

framing for guest bedrooms




















framing for the loft area and laundry










the studio full bath dowstairs



















And this is where we were this morning 23 days later, Roger was framing and finishing the closet for one of the guest bedrooms, while Fritz is busy wiring the rooms