As promised here are pics of our progress thus far. We've focused on the 2nd floor guest area/fritz's studio. This space was divided to inlcude two guest bedrooms, a hallway (we dropped the ceilings to 8 ft and created a loft area), a laundry closet, utility closet, full guest bath, studio kitchenette, studio full bath and fritz's studio. They also demoed the master bedroom to get rid of a wall and open space for the master bath/dressing room. They've turned the master into their tool/workspace. They also started framing/drywall in the downstairs studio bath so we can start using that while they finish the upstairs baths. So without further a do this what Roger and Fritz have accomplished since Roger arrived June 1 (I take no credit in the manual labor, my job was to take pictures and to put together everything for the loan)
I'm going to have to guestimate the start date of these images. Roger arrived on June 1 and I broke the camera about shortly after so I'm going to say June 5th is the start of this work.
-
1 comment:
Wow, walls are amazing things! So excited for all your progress.
Can't wait to see it on person!
Post a Comment